Chaos Constructions 1998
(R) Wlodek Black
Editorial Nicron'a reproduces the newspaper officially
informed the organizers of the demoparty "Chaos
Constructions'98" in order to bring this information to the
readers who do not have Internet access or Fido. The text
published on the official message received from ehokonferentsii
ZX.SPECTRUM Fido.
In connection with certain formal constraints (64 characters
in line instead of 80) the text has been subjected to editing,
not affecting the meaning and content of information. Also
obvious typographical errors have been corrected and produced
the original design of the text graphic means lookup program
Newspaper Nicron. The rest of the text is printed without
modification.
Venue CC98 - St. Petersburg, Russia.
According to information from the head demoparty Vsevolod
Potapov allowed to participate in distance competitions, but
with mandatory presence on the party's representative work.
Due to the fact that the editors Nicron'a not part of the
organizers of the CC98, please do not contact Nicron with
questions upcoming festival! To the extent that subsequent
information from primary sources, we will publish new
information on CC98.
[Start Quote]:
Information about demopartii
"Constructions of Chaos"
version of 2 October 1998
1. General information.
Bringing the best of the best in demostroenii on major
engines stage designs of Chaos will be held in December 1998.
One can only hope that the party will become a regular
and will be held each year.
"Constructions of Chaos" organized chaos Concern and will be
sponsored by various firms and companies of St. Petersburg and
Russia as a whole.
As stated above, demopartiya CH will occur in winter
1998 in three days.
Day 1 will be free, doors open at 9 am.
This day will serve as a prelude to the real party. People
who simply could not sign up to the parties by telephone,
mail or electronically, Boudin is given one last chance to take
part in CH. During the days 2 and 3, no registration will not
be done.
Top demonstrations, music and graphics on all competing
CH on platforms will be presented to the audience. It also will
test all equipment.
Will be a presentation of various firms and companies
Sponsors will be able to talk with the audience. Also, the
first day, Many people and organizations can show their
products and services, will present companies developing
hardware and software for all computers that are compatible
with the components of the machines, sales of hardware and
software distributors ...
On this day, friends can meet and talk quietly.
Also - the remaining tickets will be sold on the same day (NOTE:
It is recommended to reserve your tickets BEFORE Structures
Chaos).
At 5 o'clock start wild demo compo. Vote on this component
will not; the winner will be selected by sponsors. Anyway,
support for an audience (the audience -? (Approx. WB)) needed.
Wild demo compo will take about two hours, after which
Jury sponsors to identify the most original work. At this time
organizers will consult about to amend (if necessary) in the
plans for the second and third days of the party. At 8 o'clock
sponsors will announce the winner of the first competition of
Chaos Constructions 1998 - wild demo competition.
The first day will be officially closed at 10 o'clock. The
pavilion will be cleaned and reduced to "normal" state. All
necessary measures (such as: increase / decrease in the
protection, cleaning and so on) will be taken depending on the
number of visitors.
In order to attend the party in the next 2 days, everyone
should will buy tickets. Without a ticket log on days 2 and 3
will not be allowed to anyone but beautiful girls.
Days two and three days would Structural Chaos contest
the best demonstrations of computer music and graphics. NOTE:
registration during these two days will not be done!
Compos all the graphics and music will be held on the second
day, voting on all the work will be conducted on the same day.
Absolutely no votes on the chart and the music will not be
accepted the next day.
Last, but not least, is the day 3. It
Then will come the most important events - will be a demo
composting for all machines. All the votes for all the work
will be collected and counted, organizers Structural Chaos 1998
will be called and award the winners in all 15 categories.
Designs Of Chaos 1998 will be officially closed at 10
o'clock. All the results and work will be posted on the
Internet at the evening (night).
2. Compo Rules.
All work (intro, demo, graphics and music) for all platforms
can not be released before the start of the Chaos Constructions
1998, otherwise work will be disqualified.
All demonstrations and intro should work (and end)
without interference from anyone (at the same time, the demo
may have setup for audio / video hardware).
All demonstrations and an intro should be able to stop
by pressing the add.
Absolutely every job passes through the hands of
preselection committee.
Preselection.
Preselection.
PRESELECTION.
Please remember this when the surrender of his work
preselection committee.
Net animation is not allowed. It can be used,
but it may preselection committee decide to allow work
to the component or not.
Scanned (or converted) are forbidden. Please save your work
at the time of creation and provide 2.3 Committee for the
preselection (for example, if your graphics look better
pictures).
Every job must have at least one representative
(Not necessarily that he or she is part of a group that
produced the work).
a. Specific Compo Rules for GFX
+ Handdrawn gfx.
retraced / rendered gfx are not allowed.
maximum resolution - 640x480.
maximum range of colors - 24 bit.
formats - BMP, GIF, JPG, PCX, PNG.
A maximum of 2 work from one artist.
(Regulation on schedule for Spectrum are shown below).
+ Raytraced / rendered gfx.
retraced / rendered gfx allowed.
maximum resolution - 640x480.
maximum range of colors - 24 bit.
formats - BMP, GIF, JPG, PCX, PNG.
A maximum of 2 work from one artist.
(Regulation on schedule for Spectrum are shown below).
b. Specific Compo Rules for MUSIC
+4 Channel (mod) music
the maximum size of 1mb.
only MOD files.
maximum duration of 3 minutes.
maximum of 1 track from one artist.
(Pc-gus/amiga playback)
+ Multichannel music
the maximum size of 2mb.
Formats - MOD, S3M, XM, IT.
maximum duration of 3 minutes.
maximum of 1 track from one artist.
(Pc-gus/pc-sb playback)
c. Specific Compo Rules for Amiga.
Machine: A4000, accel, RAM 32mb
(Demo / intro must work on the A1200 with 8mb RAM)
+4 K intro:
the maximum size of 4k.
maximum duration of 5 minutes.
+64 K intro:
the maximum size of 64k.
maximum duration of 10 minutes.
+ Demo:
the maximum size of 8mb.
maximum duration of 20 minutes.
d. Specific Compo Rules for PC.
The machine will be restarted after each demo / intro.
Machine: PII300, RAM 64mb, 4mb AGP 2D, 16mb 3Dfx, GUS 'SB16
(Demo / intro must work on P200 with 16mb RAM and nosound / sb)
MSDOS clean / HIMEM / QEMM.
+4 K intro:
the maximum size of 4k.
maximum duration of 5 minutes.
without the use SVGA.
+64 K intro:
the maximum size of 64k.
maximum duration of 10 minutes.
without the use of permits is higher than 800x600.
+ Demo:
the maximum size of 8mb.
maximum duration of 20 minutes.
without the use of permits is higher than 800x600.
e. Specific Compo Rules for Spectrum.
Machine: Pentagon 3.5MHz, 128k, General Sound 'AY-3-8910/12,
5.25 "DS / DD FDD
(Demo / intro must work on the Scorpion)
TR DOS 5.03
+4 K intro:
the maximum size of 4k.
maximum duration of 5 minutes.
+ Demo:
the maximum size of 640k.
maximum duration of 20 minutes.
+ Gfx compo:
the maximum size of 6192 (6912 -? (Note WB)).
A maximum of 2 work from one artist.
+ Music on interrupt:
compiled by # c000.
maximum duration of 3 minutes.
maximum of 1 work from one artist.
+ Digital music:
should have its own player.
maximum duration of 3 minutes.
only AY-3-8910/12.
maximum of 1 work from one artist.
Appendix 1. Tickets
Tickets for the competition days of Structural Chaos (days
two and three) will be sold long before the party. You can
order tickets by phone / email / electronic means.
Planned to deliver an individual bar coded number on each
ticket for protection against illegal entry. Participants
(competitors) will also have to pay for tickets, would
nevertheless possible discount of 25% (depending on number of
participants in the group. Discount will be possible only if a
group of 4 or more Membury.
All participants will register well before the start of (the
names will be printed with a barcode on the tickets). All
visitors / guests will have the name of the GUEST (girls will
be named GIRL for protection against illegal entry half Smolny).
Bar code scanners will be connected to the "main" computer.
All illegal "guests" will be dealt with protection.
Appendix 2. Organization.
Drinks and food will be sold in the pavilion. Alcoholic
beverages are prohibited above 8%. Drunk people will be
expelled from the territory of the party at 1 day (their data
in the "main" computers will contain a temporary ban).
Everyone must have your ticket with you all the time.
The building will be protected by a specific organization.
Buying a ticket, the new owner agrees to all terms and
conditions printed on the back of the ticket.
All equipment will either be rented (or sponsors provided),
or it will be the personal property of the organizers party.
Since every day the party will take place over 12 hours
(9:00-22:00 pm), various seating areas will be provided
guests and participants of the party.
Appendix 3. Vote.
Voting will begin as soon as the first component, and
will occur before 7:00 pm the third day, after which the votes
will not be accepted. Contestants allowed to vote, but:! VOTE
FOR YOUR GROUP / JOB IS PROHIBITED! Violators simply reduce the
number of votes for their same job and only after that they
will be informed that they voted wrong.
System was based on a 5-point scale. From 1 as the smallest
score (BUT NOT negative, so let's not even that poor
performance) to 5 as a maximum. People can vote for an infinite
number of times for any amount of work, but the human voice for
separately taken the work will not pile up (they will be
replaced by a new assessment).
Appendix 4. Agreement
(Printed on the back of the ticket)
As a proud guest demo Partee Designs Chaos, I take full
responsibility for their attitudes and actions. If I would
suffer any damage (even inadvertently), I agree to reimburse
all damages to repair / replace damaged items.
Annex 5. List Compos:
Compo Platform Restrictions Note
Intro IBM 8K, 64K
AMiGA 8K, 64K
Spectrum 4K 4K just for the ZX
Demo IBM Pentium II should work on
266 MMX Pentium 200, 16MB
64Mb RAM,
3D card
AMiGA Amiga 4000
accel N / A
16Mb RAM
Spectrum Pentagon should work on 128
Scorpion
Wild Demo Any No limits Participants must
provide organizers ditch all
the necessary hard / software.
Should work with
audio / video system mi party.
Must be regis but in advance!
No component But the prize for
best wild demo will be.
The winner will be
selected sponsors.
(And they have been awarded)
GFX IBM 'handwork / no difference between
AMiGA raytraced IBM and AMiGA.
only
Spectrum handwork scan schedule
normal screen will not be allowed.
(6912)
Music IBM '4 channel can be player AMiGA (normal mod, on the
PC or on Ammy multichannel
Spectrum Interrupt / should have a player
Digital (separate)
Annex 6. Program (*)
Compos Day Time Events
1 none 9:00 am doors open.
3:00 pm Opening demo Partee Designs Chaos
5:00 pm Wild Demos.
7:00 pm Plans for the 2 nd and third days.
8:00 pm Sponsors will be announced and the
Award Winning To Wild Demo competition.
XX: XXxx Register "belated" people.
The best demonstration and graphics, music
verification system of the Party).
Testing of all equipment (th
losovaniya, works and components of
machines)
Installation and inspection of all work
for all machines.
2 Gfx - 10:00 am July Compos. (Music: 4 channel (mod)
Music IBM 'AMiGA - 4 (Multichannel)
(Gfx: Handwork)
(Raytraced)
Spectrum - 3 (music: On interrupt)
(Digital)
(Gfx: Handwork)
NB: NB!! Voting starts right at the windows
by Remark 4 channel music compo.
3 Demos-10:00 am August Compos.
IBM - 3 (8k and 64k intro, Demo)
Intros AMiGA - 3 (8k and 64k intro, Demo)
Spectrum-2 (4k intro and Demo)
7:00 pm Voting ends.
8:00 pm The results of all sompos and prizes.
10:00 pm Official closing
Structures of Chaos 1998.
* Actual timings may vary.
Contact Us: cha0s@cybermail.net
[End quote].